HARBORNE ACADEMY

PROJECT BREIF

A new £11.5 million building built to the front of the existing school to include a national standard sports hall, movement hall, drama studio, main hall, dining and learning facilities as well as a range of classrooms, whilst allowing the Academy to continue to operate.

The existing school was unaffected during the duration of the works requiring close co-operation between the main contractor, the school and GECON to design and manage clearly defined pedestrian and plant access routes.

WORKS PERFORMED

Site clearance and waste disposal
Service Diversions
Deep drainage
5m high in situ concrete retaining walls
Sub-structure to ground floor

TEMPORARY WORKS

110m of 7.5m deep Larsen interlocking piles.
6000m2 concrete to upper composite floors.

SECTORS

EDUCATION
COMMERCIAL/INDUSTRIAL
DEFENCE
POWER
HEALTH
WATER
HOUSING
HIGHWAYS

GET IN TOUCH

Shenstone Drive, Aldridge, Walsall, WS9 8TP

0121 357 1356

INFO@GECON.CO.UK

FOLLOW US

(C) COPYRIGHT 2017 ALL RIGHTS RESERVED. WEB FUNCTION

GECON