Coventry University

Project Brief

A new £37m re-inforced concrete, 5 storey, 120,000m2 science and health building for Coventry University.

Located in the City Centre incorporating a new energy centre and a multi-disciplinary building housing. World class teaching and simulation facilities.

With state of the art equipment and laboratory’s.

 

Works Performed

  • Reduce level dig, site strip and waste removal
  • Foundations and bases with starter bars for traditional reinforced columns
  • Drainage – foul/storm, internal/external triton attenuation system.
  • Services – Gas, Water, Electric, Data, Heating pipes
  • 4.5m high reinforced columns with beams attached
  • Ground floor slab with column trackers