Project Brief
This £30 million scheme, funded by the Department for Education, will eventually house 1,500 students at secondary and post-16 level. Constructed on a large greenfield site to facilitate a new build housing estate near the area.
The state-of-the-art building is made up of two teaching wings stemming from the main building. Externally, the project consists of a comprehensive drainage system; sports pitches and recreational facilities; dedicated safe access points such as parking and pedestrian links.
The project was ready for the school to open its doors to its first cohort of pupils in September 2023.
Works Performed
- Complete groundworks package from foundations & bases to finished floor slabs.
- Complete drainage package
- Electric service ducts and pits.
- Attenuation tank excavation.
- MUGA construction.
- Construction of feature amphitheatre in schools courtyard.
- Car park construction including EVCP.
- Finishing works including Kerbs, edgings, and slabs.